HQ Office
No.15, TheCommune, 2nd floor, Unit F-01, Street 347,
Sangkat Boeung Kak I, Khan Tuol Kouk,
Phnom Penh, Cambodia (120407)
Phone Number: + 855 (0) 23 722 215
Your Email: info@cptl.com.kh
HEADQUARTER
The Head Office provides strategic leadership, corporate governance, and
integrated management services to support the safe, reliable,
and sustainable operation of the Company's power transmission infrastructure
under the Public-Private Partnership (PPP) framework.
The Head Office Management Services are performed by CPTL’s corporate support and management teams, providing governance, strategic direction, financial management, administrative support, compliance oversight, and coordination to ensure effective business operations.
The Site Operational Services are performed by CPTL’s technical and operational teams, responsible for the safe, reliable, and efficient operation and maintenance of power transmission infrastructure, including transmission lines, substations, and associated electrical equipment.
HEADQUARTER
Management Services
• Corporate Governance and Executive Management
• Strategic Planning and Performance Management
• Financial Management and Control
• Planning, Project Development and Technical Services
• Power System Operation Management Services
• Asset Management and Reliability Services
• Procurement and Logistics Management
• Human Resources Management Services
• Corporate Administration Services
• Information Technology and Digital Support
• Compliance, Risk Management, and Internal Control
• ESG, HSE, and Sustainability Management Services
• Stakeholder and Government Coordination
SUBSTATIONS
Our Power Substation Operations team provides continuous 24/7 operational control
of the company's transmission substations to ensure
safe, reliable, and efficient power transmission.
SUBSTATIONS
Power Substation Operational Services
• 24/7 substation monitoring and operation.
• Safe switching and equipment isolation.
• Monitoring of transformers, switchgear, protection, and control systems.
• Coordination with the National Load Dispatch Centre and stakeholders.
• Fault response and service restoration.
• Operational logging and performance reporting.
• Maintenance support and outage coordination.
• Compliance with Grid Code, license conditions, and regulatory requirements.
• Protection of personnel, assets, and critical infrastructure.
• Continuous improvement of reliability, efficiency, and availability.
• Safe switching and equipment isolation.
• Monitoring of transformers, switchgear, protection, and control systems.
• Coordination with the National Load Dispatch Centre and stakeholders.
• Fault response and service restoration.
• Operational logging and performance reporting.
• Maintenance support and outage coordination.
• Compliance with Grid Code, license conditions, and regulatory requirements.
• Protection of personnel, assets, and critical infrastructure.
• Continuous improvement of reliability, efficiency, and availability.
Banteay Meanchey Substation
(GS14)
• Type: AIS
• Power Transformer: 2 × 50 MVA, 115/22 kV
• 22kV x 2 Incoming with 11 Outgoing Feeders
• 115kV Bay Line: 3 (between Battambang substation, Siem Reap Substation and Industrial Estate substation)
• Location: National Road 6, Phum I, Sangkat Preah Punlea, Serey Sophorn Commune, Banteay Meanchey Province
Battambang Substation
(GS16)
• Type: AIS
• Power Transformer: 25 MVA, 115/22 kV
• 22kV x 1 Incoming Feeder with 3 Outgoing Feeders
• 115kV Bay Line: 1 (T-Connection Between CPG and Banteay Meanchey Substation)
• Location: Kokos Road, Phum Kakaoh, Outaki Commune, Thma koul District, Battambang Province.
Siem Reap Substation
(GS30)
• Type: AIS
• Power Transformers:
1 × 50 MVA, 115/22 kV
1 × 25 MVA, 115/22 Kv
• 22kV x 2 Incoming with 8 Outgoing Feeders
• 115kV Bay Line: 2 (Between Banteay Meanchey Substation and New Siem Reap Substation)
• Location: National Road 6, Phum Tuek Thla, Khnat Commune, Puok District, Siem Reap Province.
New Siem Reap Substation (GS31)
• Type: AIS
• Power Transformer: 1 × 50 MVA, 115/22 kV
• 22kV x 2 Incoming with 9 Outgoing Feeders
• 115kV Bay Line: 1 (Between Siem Reap Substation)
• Location: