OUR PROJECTS
TRANSMISSION LINE
EXTENSION
PROJECTS
Write one or two paragraphs describing your product or services. To be successful your content needs to be useful to your readers.
Start with the customer – find out what they want and give it to them.
New 115kV Transmission Lines 26.5Km
March-2016
474 Concrete poles (22 m)
Single circuit, single conductor AAC 400 sq.mm Puok Siem Reap to New Siem Reap Substation
Siem Reap Substation (GS2)
March-2016
One 115kV Transmission line bay
One 115 kV Power transformer bay with 115/22 kV, 50 MVA Power transformer
One Control building 18 x 46 m
One 22kV – 3x2.4 Mvar capacitor bank
Siem Reap Substation
Upgrading Industrial Estate Substation
July-2015
One 115kV Power transformer bay with One Power transformer 115/22 kV, 50MVA
Extended control room 10.5 x 16 m
Six cubicles of 22kV switchgear (1 incoming, 5 outgoing, 1 cap-bank, 1 VT bus, 1 FLBS)
One 22kV – 3x2.4 Mvar capacitor bank
Industrial Estate Substation
Upgrading Siem Reap Sustation (GS1)
July-2015
One 115 kV Transmission line bay
Six cubicles of 22kV switchgear (1 incoming, 3 outgoing, 1 cap-bank, 1 VT bus, 1 FLBS)
Siem Reap Substation (GS1)
EXISTING
PROJECTS
From the interconnection point at the border to the industrial estate substation
Nov-2007
115 kV 6-1C x 400 Sq.mm. AAC Transmission Line
Distance: 4.5 km
Type of Structure:
- 50 Concrete Poles (4 km)
- 2 Steel Poles (0.5 km)
Industrial Estate Substation
From Industrial Estate Substation To Banteay Meanchey Substation
Nov-2007
115 kV 6-1C x 400 Sq.mm. AAC Transmission Line
Distance: 55 km
Type of Structure:
- 526 Concrete Poles (43 km),
- 41 Steel Poles (12 km)
Industrial Estate Substation, Banteay Meanchey
From Banteay Meanchey Substation To Battambang Substation
Nov-2007
115 kV 3-1C x 400 Sq.mm. AAC Transmission Line
Distance: 60 km
Type of Structure:
- 805 Concrete Poles (53 km),
- 25 Steel Poles (7 km)
Banteay Meanchey, Battambang
From Banteay Meanchey Substation To Siem Reap Substation
Nov-2007
115 kV 3-1C x 400 Sq.mm. AAC Transmission Line
Distance: 85 km
Type of Structure: 1,256 Concrete Poles (53 km)
Banteay Meanchey, Siem Reap
Banteay Meanchey Substation
Nov-2007
Type: AIS
3 x 115 kV Line Bay
Power Transformer : 115/22 kV, 25 MVA
1 Control Building
1 x 22 kV Incoming Feeder and 3 x 22 kV Outgoing Feeders
Banteay Meanchey
Battambang Substation
Nov-2007
Type: AIS
3 x 115 kV Line Bay
Power Transformer : 115/22 kV, 25 MVA
1 Control Building
1 x 22 kV Incoming Feeder and 3 x 22 kV Outgoing Feeders
Battambang
Siem Reap Substation (GS1)
Nov-2007
Type: AIS
3 x 115 kV Line Bay
Power Transformer : 115/22 kV, 50 MVA
1 Control Building
1 x 22 kV Incoming Feeder and 5 x 22 kV Outgoing Feeders
Siem Reap
3 x 115 kV Line Bay
Power Transformer : 115/22 kV, 50 MVA
1 Control Building
1 x 22 kV Incoming Feeder and 5 x 22 kV Outgoing Feeders
Siem Reap
OTHER
PROJECTS
Underground Line Project
Nov 2019
Dismantlement of 115kV Transmission Line along Hanoi and Vatanak Road & Construction of 115kV Underground Cable from NCC to Toul Kork and 22kV Overhead Line Project.
Owner: EDC
Contractor: CPTL-CCCE-EM Joint Venture
Location: Phnom Penh
115 kV Shunt Capacitor Bank Project
09 Appril 2017
Equipment and Shunt Capacitor Bank 115 kV
for Voltage Increment in Puok Siem Reap Substation
for Voltage Increment in Puok Siem Reap Substation
Owner: EDC
Contractor: CPTL-EM Joint Venture
Siem Reap
BM-BT 2nd 115 kV line installation Project
28 May 2016
Installation another line on existing line (57 km)
Owner: EDC
Contractor: CPTL
Banteay Meanchey, Battambang